July, 2026 DLI Report

Table of Contents

  1. Summary
  2. Background
  3. Objectives
  4. Materials and Methods
  5. DLI Data
  6. DLI and PPFD Excel Sheets

Summary

DLI data were available for the second to the third week of July for Leamington-Kingsville. The average DLI for the month of ­­­­­July for Leamington-Kingsville was 57 moles/m2/day. The maximum DLI was 74 recorded on July 12th, and the minimum DLI was 41 recorded on July 17th. 

DLI data were available for most of July for Vineland. The average DLI for the month of ­­­­­July for Vineland was 51 moles/m2/day. The maximum DLI was 68 recorded on July 12th, and the minimum DLI was 15 recorded on July 15th.

Leamington-Kingsville received approximately 7% less light in July than in June. The monthly DLI average for July 2026 is 5% lower than it was in July 2025.

Vineland received 4% more light in July than June. Vineland received 11.7% less light than Leamington-Kingsville.

Listen to the monthly DLI radio report or read the transcript of the radio report below. It airs on the second Tuesday of every month on Country 91.3 during the Noon Farm Show.

Hello. Welcome to the monthly daily light integral (DLI) report for the regions of Windsor-Essex and Niagara. 

I’m Averie Mastronardi, Greenhouse Research Assistant with the Ontario Ministry of Agriculture, Food and Agribusiness (OMAFA).To learn more about our DLI data collection project visit the ONGreenhouseVegetables.ca blog or the ONFloriculture.com blog. 

DLI is the total amount of light within the photosynthetically active radiation spectrum that impacts a surface in one day, and it is measured in moles per metre squared per day. It is important to greenhouse production because it represents the amount of light that is available to the crop for photosynthesis and can be used to adjust the growing environment to optimize crop yield. 

The data provided here reflects outdoor light, which can be significantly higher than light levels inside greenhouses. The desired DLI inside a greenhouse is different for each crop. You can find more information on DLI levels for greenhouse fruit and vegetable crops in the OMAFA production guides available on the ONGreenhouseVegetables.ca blog. 

DLI data were available for the second to the third week of July for Leamington-Kingsville. The average DLI for the month of ­­­­­July for Leamington-Kingsville was 57 moles/m2/day. The maximum DLI was 74 recorded on July 12th, and the minimum DLI was 41 recorded on July 17th. 

DLI data were available for most of July for Vineland. The average DLI for the month of ­­­­­July for Vineland was 51 moles/m2/day. The maximum DLI was 68 recorded on July 12th, and the minimum DLI was 15 recorded on July 15th.

Leamington-Kingsville received approximately 7% less light in July than in June. The monthly DLI average for July 2026 is 5% lower than it was in July 2025.

Vineland received 4% more light in July than June. Vineland received 11.7% less light than Leamington-Kingsville.

The next monthly DLI radio report will be on Tues, Sept. 8th.

Thanks for your attention, and have a great day.

Continue Reading: July, 2026 DLI Report

June, 2026 DLI Report

Summary

DLI data were available for two and half weeks in June for Leamington-Kingsville. The average DLI for the month of June 2026 for Leamington-Kingsville was 61 moles/m2/day. The maximum DLI was 73.1 recorded on June 7th, and the minimum DLI was 38.9 recorded on June 21st.

DLI data were available for two weeks in June for Vineland. The average DLI for the month of June for Vineland was 49 moles/m2/day. The maximum DLI was 75.1 recorded on June 6th, and the minimum DLI was 22.8 recorded on June 25th.

Leamington-Kingsville received 22% more light in June than May. The monthly DLI average for June 2026 was 15% higher than it was in June 2025.

Last month’s data were not available for Vineland but compared to April it received 53% more light in June. Vineland received 20% less light than Leamington-Kingsville.

Listen to the monthly DLI radio report (below) that airs on the second Tuesday of every month on Country 91.3 during the Noon Farm Show.

Continue reading “June, 2026 DLI Report” →

Fourth Intake of Agricultural Stewardship Initiative Cost-Share Funding Program Opens July 8, 2026

The governments of Ontario and Canada are investing an additional $12 million through the Agricultural Stewardship Initiative (ASI) to help farmers adopt practical improvements that increase efficiency, reduce costs and build long-term resilience. This initiative delivers on the government’s plan to protect Ontario’s farmers and agri-food sector by making strategic investments in cutting-edge solutions needed to support modern farming and help the sector remain resilient and competitive in the global marketplace.

Continue reading “Fourth Intake of Agricultural Stewardship Initiative Cost-Share Funding Program Opens July 8, 2026” →

May, 2026 DLI Report

Summary

The average DLI for Leamington-Kingsville for May was 50 moles/m2/day. The maximum DLI was 71.5 recorded on May 30th, and the minimum DLI was 11.7 recorded on May 23rd. 

Leamington-Kingsville received 16% more light in May than April. The monthly DLI average in May 2026 was similar to the average DLI recorded in May 2025, with only a 9% increase this year. 

DLI data for Vineland was not available for May.

Listen to the monthly DLI radio report (below) that airs on the second Tuesday of every month on Country 92.9 during the agriculture show at noon.

Continue reading “May, 2026 DLI Report” →

Save on Energy’s Expanded Energy Management Program – EMIS Updates for Greenhouse Operators

Save on Energy logo

Energy management information systems (EMIS) can reduce energy consumption and GHG emissions, lower utility costs, improve operational performance, and strengthen decision‑making. Receive funding of up to $50,000 or $250,000, depending on your annual energy consumption, for the installation of an EMIS through Save On Energy’s Expanded Energy Management program. The EMIS funding ends March 31, 2027, and incentive payments must be made by this date. To ensure your incentive is available, we recommend that organizations aim to complete approved projects by the end of 2026. 

Continue reading